EIGHT MILE ROAD over BIG DRY RUN CREEK

5.17 MI N OF US 52 · County 061, Ohio · Built 1933 · 2 Lanes · 11,913 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
3132722
Year Built
1933
Length
9.1 m (29.9 ft)
Max Span
7.6 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
11,913
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.