CR CNTY HWY CO453 over US 42

SR 126 OVER US 42 · County 061, Ohio · Built 1990 · 2 Lanes · 20,036 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
3118703
Year Built
1990
Length
57.9 m (190 ft)
Max Span
23.8 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
20,036
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.