S.R. 126 over SB I-75

WB SR 126 OVER SB I75 · County 061, Ohio · Built 1990 · 2 Lanes · 6,865 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
3118614
Year Built
1990
Length
131.7 m (432.1 ft)
Max Span
26.5 m
Width
17.9 m (58.7 ft)
Lanes
2
Daily Traffic
6,865
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.