WESLEY AVE over SR 562

.2 MI E OF USR 22 · County 061, Ohio · Built 1970 · 4 Lanes · 1,949 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
3113981
Year Built
1970
Length
54 m (177.2 ft)
Max Span
20.1 m
Width
18.7 m (61.4 ft)
Lanes
4
Daily Traffic
1,949
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.