WB IR 275 over LIT. MIAMI RIVER;BIKEWAY

3 MI W OF US 22 · County 061, Ohio · Built 1971 · 3 Lanes · 35,701 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
3113604
Year Built
1971
Reconstructed
2002
Length
262.4 m (860.9 ft)
Max Span
42 m
Width
16.3 m (53.5 ft)
Lanes
3
Daily Traffic
35,701
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.