NB IR 75 over SHARON ROAD

1.1 N OF SR 126 · County 061, Ohio · Built 2022 · 4 Lanes · 129,353 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
3110966
Year Built
2022
Length
41.5 m (136.2 ft)
Max Span
40.5 m
Width
25.5 m (83.7 ft)
Lanes
4
Daily Traffic
129,353
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.