NB IR 75 over DAVIS STREET

2.4 MI N OF SR 4 · County 061, Ohio · Built 1965 · 3 Lanes · 67,075 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
3110591
Year Built
1965
Length
35.1 m (115.2 ft)
Max Span
13.1 m
Width
16.6 m (54.5 ft)
Lanes
3
Daily Traffic
67,075
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.