EB IR 74 over CR 184;TRIB TAYLOR CREEK

1.4 MI E OF SR 128 · County 061, Ohio · Built 1964 · 3 Lanes · 36,784 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
3108406
Year Built
1964
Length
139.4 m (457.3 ft)
Max Span
26.5 m
Width
14.9 m (48.9 ft)
Lanes
3
Daily Traffic
36,784
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.