2ND ST TO NB 71 over BROADWAY

.2MI S. OF LYTLE TUNNEL · County 061, Ohio · Built 2000 · 1 Lanes · 105,150 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
3105687
Year Built
2000
Length
172.1 m (564.6 ft)
Max Span
62 m
Width
9.9 m (32.5 ft)
Lanes
1
Daily Traffic
105,150
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.