C0366 over Salt Fork Lake Feeder

1.5 MI N CAMBRIDGE W I77 · County 059, Ohio · Built 2015 · 2 Lanes · 172 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
3030002
Year Built
2015
Length
28.4 m (93.2 ft)
Max Span
27.4 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
172
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.