NB IR 675 over YELLO SPRINGS-FAIRFLD RD

.6 MI N OF SR 235 · County 057, Ohio · Built 1975 · 2 Lanes · 23,339 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
2904306
Year Built
1975
Length
36 m (118.1 ft)
Max Span
15.9 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
23,339
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.