FOWLERS MILL over CHAGRIN RIVER

0.18 Mi. N. of US 322 · County 055, Ohio · Built 2014 · 2 Lanes · 588 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
2830010
Year Built
2014
Length
8.7 m (28.5 ft)
Max Span
7.9 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
588
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$190,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.