SR 7 over TEENS RUN

0.33 Mi N GAL DAM · County 053, Ohio · Built 2019 · 2 Lanes · 2,500 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
2700302
Year Built
2019
Length
46 m (150.9 ft)
Max Span
17.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.