FULTON LUCAS RD over I80 OHIO TPK

11.2MI WEST OF EXIT 4 · County 051, Ohio · Built 1954 · 2 Lanes · 22,000 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
2629984
Year Built
1954
Reconstructed
2005
Length
58.8 m (192.9 ft)
Max Span
20.1 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
22,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.