IR 80 TPK over SR 108

0.4MI WEST OF EXIT 34 · County 051, Ohio · Built 1954 · 4 Lanes · 11,235 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
2629453
Year Built
1954
Reconstructed
2020
Length
32 m (105 ft)
Max Span
13.6 m
Width
19.4 m (63.6 ft)
Lanes
4
Daily Traffic
11,235
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.