WINCHESTER PIKE over GEORGE CR(WINCH.PIKE)

0.35 MI WEST OF GENDER RD · County 049, Ohio · Built 2022 · 2 Lanes · 11,860 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
2533367
Year Built
2022
Length
33.2 m (108.9 ft)
Max Span
12.6 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
11,860
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.