SR315 over N BROADWAY EXIT RAMP

SR 315 & N BROADWAY · County 049, Ohio · Built 2020 · 3 Lanes · 49,720 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
2515558
Year Built
2020
Length
61.9 m (203.1 ft)
Max Span
23.6 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
49,720
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.