SR 104 over CSX RR AND PARSONS AVE

0.45 MI E OF US23 · County 049, Ohio · Built 1971 · 4 Lanes · 41,173 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
2508826
Year Built
1971
Length
242.3 m (794.9 ft)
Max Span
43.1 m
Width
27.7 m (90.9 ft)
Lanes
4
Daily Traffic
41,173
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.