NOE BIXBY RD over I-70

0.39 MI W OF I-270 · County 049, Ohio · Built 1967 · 2 Lanes · 14,606 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
2505614
Year Built
1967
Length
132.4 m (434.4 ft)
Max Span
41.8 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
14,606
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.