I 70 over HAMILTON DITCH

HAMILTON DITCH · County 049, Ohio · Built 1970 · 3 Lanes · 33,202 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
2503816
Year Built
1970
Length
18.3 m (60 ft)
Max Span
6.9 m
Width
16.5 m (54.1 ft)
Lanes
3
Daily Traffic
33,202
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.