US-62 over ROCKY FORK CREEK

2.5 MI S OF SR161 · County 049, Ohio · Built 2007 · 2 Lanes · 10,686 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
2503476
Year Built
2007
Length
61.2 m (200.8 ft)
Max Span
22.9 m
Width
20.4 m (66.9 ft)
Lanes
2
Daily Traffic
10,686
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.