HARMONY RD-CR 74 over CAMP RUN HARMONY RD

0.2 MI N PALMER RD · County 047, Ohio · Built 1964 · 2 Lanes · 477 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
2431181
Year Built
1964
Length
8.2 m (26.9 ft)
Max Span
8.2 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
477
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.