HAROLD ROAD-CR21 over MAIN PAINT CK - HAROLD R

0.25 MI W SR 729 · County 047, Ohio · Built 1965 · 2 Lanes · 477 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
2430355
Year Built
1965
Length
43.9 m (144 ft)
Max Span
15.2 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
477
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$56,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.