SNOWHILL-CR9 over SUGAR CREEK SNOWHILL RD

0.35 MI E STAUN-JASPER · County 047, Ohio · Built 1962 · 2 Lanes · 689 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
2430169
Year Built
1962
Reconstructed
2021
Length
41.1 m (134.8 ft)
Max Span
15.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
689
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$287,985,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.