SR 734 over E FORK PAINT CREEK

0.16 MI W OF SR38 · County 047, Ohio · Built 1958 · 2 Lanes · 529 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
2402947
Year Built
1958
Length
36.1 m (118.4 ft)
Max Span
13.7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
529
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.