MAD-34 Landis Cr78 over CLEAR CREEK

.2 Mi. S. CR 69 · County 045, Ohio · Built 2016 · 2 Lanes · 485 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
2330002
Year Built
2016
Length
24.4 m (80.1 ft)
Max Span
9.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
485
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.