Miller Farm Run over Gillette Run

Carroll N Con ov Gillette · County 045, Ohio · Built 2016 · 2 Lanes · 7,010 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
2300591
Year Built
2016
Length
39.1 m (128.3 ft)
Max Span
14.6 m
Width
16.6 m (54.5 ft)
Lanes
2
Daily Traffic
7,010
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.