ANGLING RD TR-144 over I80 OHIO TURNPIKE

10.4 MI EAST OF EXIT 7 · County 043, Ohio · Built 1998 · 2 Lanes · 672 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
2229897
Year Built
1998
Length
72.2 m (236.9 ft)
Max Span
22.6 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
672
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.