I80 OH TPK over CHAPPLE CREEK DITCH

8MI EAST OF EXIT 118 · County 043, Ohio · Built 1954 · 6 Lanes · 40,573 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
2229838
Year Built
1954
Reconstructed
1997
Length
33.5 m (109.9 ft)
Max Span
8.2 m
Width
38.3 m (125.7 ft)
Lanes
6
Daily Traffic
40,573
Material
Concrete Continuous
Design
Slab
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.