I80 OH TPK over HURON RIVER &RR (CLOSED)

1MI EAST OF EXIT 7 · County 043, Ohio · Built 1954 · 6 Lanes · 20,287 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
2229463
Year Built
1954
Reconstructed
1998
Length
338.5 m (1110.6 ft)
Max Span
39.3 m
Width
38.7 m (127 ft)
Lanes
6
Daily Traffic
20,287
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.