I80 OH TPK over DITCH

7.5MI WEST OF EXIT 7 · County 043, Ohio · Built 1954 · 6 Lanes · 40,413 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
2229064
Year Built
1954
Length
14 m (45.9 ft)
Max Span
4.3 m
Lanes
6
Daily Traffic
40,413
Material
Concrete
Design
Culvert
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.