SR 2 over OVER ERI-060-0816

OVER SR 60 · County 043, Ohio · Built 1973 · 5 Lanes · 8,684 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
2204940
Year Built
1973
Length
59.4 m (194.9 ft)
Max Span
16.8 m
Width
20.4 m (66.9 ft)
Lanes
5
Daily Traffic
8,684
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.