SR 2 over SUGAR CREEK

4.58 MILES EAST OF SR 61 · County 043, Ohio · Built 1973 · 2 Lanes · 10,326 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
2204851
Year Built
1973
Length
16.5 m (54.1 ft)
Max Span
6.1 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
10,326
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.