USR 6 over OVER ERI-002-1542

AT SR 2 · County 043, Ohio · Built 1961 · 2 Lanes · 15,816 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
2201836
Year Built
1961
Reconstructed
2001
Length
90.5 m (296.9 ft)
Max Span
26.2 m
Width
17.7 m (58.1 ft)
Lanes
2
Daily Traffic
15,816
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$21,000
Total Project Cost
$30,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.