MOODY RD. over CULVER CREEK
0.4 MI N OF JUSTAMERE RD. · County 041, Ohio · Built 2016 · 2 Lanes · 150 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
40.314181, -82.75975
This bridge is in worse condition than 19.5% of bridges in County 041. The average bridge in Ohio is 0 years old; this one is 10 years old.
Nearby Bridges
ULERY RD. over SUGAR CREEK
Built 1987
TRIMMER RD. over SUGAR CREEK
Built 1933
OLIVE GREEN RD. over SUGAR CREEK
Built 2011
LANE RD. over S. FORK CULVER CREEK
Built 2008
PORTER-CENTRAL RD. over CULVER CREEK
Built 1987
CENTERBURG RD. over S. BRANCH OF CULVER CREE
Built 1930
CONDIT RD. over SOUTH BRANCH CULVER CR.
Built 2012
CENTERBURG RD. over SOUTH BRANCH CULVER CREE
Built 2012
CR.13 over LONG RUN
Built 2002
FREDRICKS RD. over SUGAR CREEK
Built 1995
Bridge Details
- Structure #
- 2136880
- Year Built
- 2016
- Length
- 8.6 m (28.2 ft)
- Max Span
- 8.2 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.