US 36 over OVER I-71

3.78 MI W OF SR 61 · County 041, Ohio · Built 1958 · 6 Lanes · 24,854 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
2101149
Year Built
1958
Reconstructed
2024
Length
81 m (265.7 ft)
Max Span
24.9 m
Width
25 m (82 ft)
Lanes
6
Daily Traffic
24,854
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.