HILLGROVE-SOUTH over SNELL DT

.2 MI N STATE ROUTE 502 · County 037, Ohio · Built 1992 · 2 Lanes · 208 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
1943308
Year Built
1992
Length
11.9 m (39 ft)
Max Span
11.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
208
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.