SR-705 over SPRING CREEK

.36 M.W.OF SHELBY CO LINE · County 037, Ohio · Built 2001 · 2 Lanes · 1,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1904124
Year Built
2001
Length
7.7 m (25.3 ft)
Max Span
7.3 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
1,300
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.