MLK BLVD 9-1 over DOAN BROOK 9-1

N OF AMBLESIDE DRIVE · County 035, Ohio · Built 1900 · 3 Lanes · 16,514 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
1869612
Year Built
1900
Reconstructed
1984
Length
8.5 m (27.9 ft)
Max Span
8.2 m
Width
18.9 m (62 ft)
Lanes
3
Daily Traffic
16,514
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000
Total Project Cost
$400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.