St. Casimir Way over DOAN BROOK

AT MARTIN-LUTHER KING DR · County 035, Ohio · Built 1980 · 2 Lanes · 1,340 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
1866257
Year Built
1980
Reconstructed
2019
Length
8.5 m (27.9 ft)
Max Span
7.9 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
1,340
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$440,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.