S WOODLAND CR 21 over DOAN BROOK

182 FT W. OF S. PARK DR. · County 035, Ohio · Built 1990 · 2 Lanes · 5,869 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1831968
Year Built
1990
Length
9.8 m (32.2 ft)
Max Span
9.4 m
Width
19.8 m (65 ft)
Lanes
2
Daily Traffic
5,869
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.