ALBION ROAD over I80 OHIO TURNPIKE

0.4 MI EAST OF GATE 10 · County 035, Ohio · Built 1998 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
1829599
Year Built
1998
Length
92.7 m (304.1 ft)
Max Span
28.3 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.