I80 OH TPK over DITCH

5.5MI EAST OF EXIT 9 · County 035, Ohio · Built 1954 · 6 Lanes · 28,820 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
1829319
Year Built
1954
Length
10.7 m (35.1 ft)
Max Span
4.6 m
Lanes
6
Daily Traffic
28,820
Material
Concrete
Design
Culvert
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.