RAMP WEST OF I-271 over USR 322 (1340) @ MP 34.9

JCT. US-322 WITH I-27 · County 035, Ohio · Built 1961 · 2 Lanes · 39,660 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1811649
Year Built
1961
Length
71.9 m (235.9 ft)
Max Span
19.8 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
39,660
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.