CEDAR RD over IR271&271X (CEDAR)
2.29 MI. S. OF JCT US-322 · County 035, Ohio · Built 1963 · 6 Lanes · 21,190 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
41.501228, -81.480008
This bridge is in worse condition than 48.9% of bridges in County 035. The average bridge in Ohio is 0 years old; this one is 63 years old.
Nearby Bridges
BRAINARD RD over IR271&271X (BRAINARD)
Built 1963
SR 175 over EUCLID CRK 1.03 MI S 322
Built 1985
LANDER RD over IR271&271X (LANDER)
Built 1963
FAIRMOUNT BLVD. WB over IR271&271X (FAIRMOUNT)
Built 1962
FAIRMOUNT BLVD. EB over IR271&271X (FAIRMOUNT)
Built 1962
LANDER ROAD CR 20 over CREEK TO CHAGRIN RIVER
Built 2000
LANDER ROAD CR 20 over CREEK TO CHAGRIN RIVER
Built 1998
IR 271 SB over SHAKER BLVD EB @ MP 30.9
Built 1962
IR 271 NB over SHAKER BLVD EB (CR13A)
Built 1962
1R 271X SB over SHAKER BLVD EB (CR13A)
Built 1995
Bridge Details
- Structure #
- 1811460
- Year Built
- 1963
- Length
- 177.7 m (583 ft)
- Max Span
- 37.8 m
- Width
- 22.6 m (74.1 ft)
- Lanes
- 6
- Daily Traffic
- 21,190
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,250,000
- Total Project Cost
- $2,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.