Harvard Ave(CR-43) over IR-77 (Harvard Ave)

IR-77 @ Harvard Ave · County 035, Ohio · Built 2019 · 6 Lanes · 12,848 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
1810000
Year Built
2019
Length
43.4 m (142.4 ft)
Max Span
42.3 m
Width
25.8 m (84.6 ft)
Lanes
6
Daily Traffic
12,848
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.