EAST 22ND ST CR-71 over IR-90 (E 22ND)

.36 MI. E. OF JCT. I-77 · County 035, Ohio · Built 1958 · 2 Lanes · 5,522 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1807838
Year Built
1958
Length
38.9 m (127.6 ft)
Max Span
18.9 m
Width
28.3 m (92.8 ft)
Lanes
2
Daily Traffic
5,522
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.