HARRIS RD over IR-77 (UND HARRIS RD)

.63 MI. N. OF JCT. SR-82 · County 035, Ohio · Built 1971 · 2 Lanes · 4,967 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1805886
Year Built
1971
Reconstructed
2012
Length
94.8 m (311 ft)
Max Span
27.4 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
4,967
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.