SR 17 over CUYAHOGA RIVER

APPROX 500 FT E SR21 · County 035, Ohio · Built 1939 · 4 Lanes · 14,111 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
1802585
Year Built
1939
Reconstructed
1993
Length
70.7 m (232 ft)
Max Span
28.7 m
Width
17.7 m (58.1 ft)
Lanes
4
Daily Traffic
14,111
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$360,000
Total Project Cost
$400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.