CR-398 ELLA AVE over SR-14EB (BROADWAY AVE)

APPROX .5MI S HARVARD BLV · County 035, Ohio · Built 1960 · 3 Lanes · 9,170 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1801716
Year Built
1960
Length
82.6 m (271 ft)
Max Span
23.5 m
Width
11.9 m (39 ft)
Lanes
3
Daily Traffic
9,170
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.